Indirect Expenses= cost of running an office (bills,paper,etc) Outside Consulting=cost of MEP,Structural, enclosure experts (stuff we don't know how to do or aren't willing to learn and accept liability for) Direct= our fees (stuff we're expected to know)This means design fees are being consumed by specialized knowledge, rising energy costs, and increased insurance rates. It's probably time to bail or learn a trade.
For more on this topic check out this link from Archinect.
1 comment:
if this graph continued it'd be crazy depressing....
Post a Comment